Pre-engineering study
All heat pump projects at Circular Energy starts with a pre-engineering study to thoroughly analyze your specific challenges, situation, data, and requirements with the goal to identify the optimum solution. A pre-engineering study also includes an Advanced Energy Analysis to discover hidden energy losses.
- Energy saving potential of high-temperature heat pump integration
- CAPEX and OPEX estimation
- Investment clarity through techno-economic analysis